×

Overview

“Eldorado PV Solar Water Pumping Systems”

• Development, feasibility, installation, and operation of 8 systems.

• Pre-feasibility studies.

• Engineering.

• Installation of the system.

• Commissioning of all system.

• Development of components (mainly the screw pump) and systems so as to achieve most energy efficient optimum system.

• Applying all possible energy efficiency measures in water pumping systems including equipment, piping, fittings…etc. so as to minimize power requirements.

• Analyze water and energy consumption for all pumping stations.

• Monitoring hydraulic head to investigate drawdown and its effect on pump efficiency and thus to determine the needs for development and/or changing the pump to meet the variable well pumping head. The aim is to keep pump working at its maximum efficiency point.

• Many status and activity reports.

• Perform protective tests on all pump station equipment.

Liaison with all stakeholders including ministry of Water and Irrigation


  • Client
    GIZ/ Water Authority of Jordan and The National Energy Centre at the RSS
  • Budget
    US$
  • Duration
    2 years

Have Query ?